Deliverables
All deliverables expected throughout CAELESTIS.
Deliverable | Title | Work Package | Lead Beneficiary | Type | Dissemination Level | Expected Date | PDF |
---|---|---|---|---|---|---|---|
D1.1 | Specifications of CAELESTIS Simulation Ecosystem | WP1 | BSC | Report | PU | 30th November 2022 (M7) | Download |
D1.2 | Specifications of simulation process workflows and UQ&M methodology | WP1 | ITA | Report | SEN | 30th November 2022 (M7) | n/a |
D1.3 | Concept of Outlet Guide Vane and preliminary design space and bill of materials | WP1 | GKN | Report | SEN | 30th November 2022 (M7) | n/a |
D2.1 | CAELESTIS Hyperconnected Interoperable Simulation Ecosystem architecture & PRESS analysis | WP2 | BSC | Other | PU | 31st October 2023 (M19) | |
D2.2 | CAELESTIS software and adaptive simulation workflow implementation | WP2 | BSC | Other | PU | 30th April 2024 (M24) | |
D3.1 | Digital product modelling strategy | WP3 | UDG | Report | SEN | 30th September 2023 (M18) | n/a |
D3.2 | Open-source code and probabilistic material models | WP3 | TUD | Other | PU | 30th September 2023 (M18) | |
D3.3 | Digital product module for HPC | WP3 | BSC | Other | PU | 30th April 2024 (M24) | |
D4.1 | AFP Process Interoperable Digital Twin with permeability predictions | WP4 | ADD | Report | PU | 30th April 2024 (M24) | |
D4.2 | RTM Process Interoperable Digital Twin with process defect predictions | WP4 | ITA | Report | PU | 30th April 2024 (M24) | |
D4.3 | Assembly Tolerancing Digital Twin | WP4 | JVN | Report | PU | 30th April 2024 (M24) | |
D5.1 | UQ&M strategy for product and manufacturing | WP5 | JVN | Other | PU | 30th September 2024 (M29) | |
D5.2 | Massive simulation campaign results | WP5 | BSC | Report | SEN | 30th September 2024 (M29) | n/a |
D5.3 | Topology optimization open-source code | WP5 | TUD | Report | PU | 30th September 2024 (M29) | |
D5.4 | OGV use case final design | WP5 | GKN | Report | SEN | 30th September 2024 (M29) | n/a |
D6.1 | AFP monitoring systems with embedded intelligence | WP6 | AIM | Demonstrator | SEN | 31st December 2024 (M32) | n/a |
D6.2 | CAELESTIS Building Block Approach for product qualification by analysis | WP6 | GKN | Report | SEN | 31st December 2024 (M32) | n/a |
D7.1 | CAELESTIS Interoperable Simulation Ecosystem integration | WP7 | ESI | Report | PU | 31st May 2025 (M37) | |
D7.2 | OGV use case & report on inline quality control & testing | WP7 | GKN | Demonstrator | SEN | 30th September 2025 (M41) | n/a |
D7.3 | Innovation roadmap, including recommendations towards simulation assisted certification | WP7 | AIM | Report | SEN | 31st October 2025 (M42) | n/a |
D8.1 | DECC Plan | WP8 | RTDS | Report | SEN | 31st October 2022 (M6) | n/a |
D8.2 | MAC Plan | WP8 | RTDS | Report | SEN | 31st December 2022 (M8) | n/a |
D8.3 | Report on D&C and MAC tools & measures | WP8 | RTDS | Report | SEN | 30th November 2023 (M20) | n/a |
D8.4 | Report on IP & exploitation plan development | WP8 | RTDS | Report | SEN | 31st March 2024 (M24) | n/a |
D8.5 | Post-Project Exploitation Plan | WP8 | RTDS | Report | SEN | 31st October 2025 (M42) | n/a |
D9.1 | Quality Assurance Plan | WP9 | AIM | Report | SEN | 30th June 2022 (M2) | n/a |
D9.2 | Periodic Ethics & Risk Monitoring Report | WP9 | AIM | Report | SEN | 31st October 2022 (M6) | n/a |
D9.3 | Data Management Plan | WP9 | RTDS | Report | SEN | 31st October 2022 (M6) | n/a |